| Extension Phase 3 |
|---|
| Thumbnail View |  | | First temporary kitchen |  | | Second temporary kitchen, this time with running cold water. |  | |  | | Old heating pipes |  | |  | | New waste pipe from upstairs |  | | The other side of the wall |  | |  | |  | |  | | Finally it gets out to floor level and into the main drain |  | | The new sink waste pipe |
|