| Extension Phase 3 |
|---|
| Thumbnail View |
 |
| New drain pipes |
 |
| Flat roof insulation |
 |
|
 |
| The last part of the old back door |
 |
| The old water main |
 |
| The new one (temporarily anyway) |
 |
| New garage space |
 |
| That patch of new concrete is where the old oil tank was |
 |
| Two new platforms for the oil tank and new external boiler |
 |
| The main steel beam has been joined together |
 |
| Kitchen roof |
 |
|
 |
| Study roof |
 |
| The final rain water drain |
 |
|
 |
| View from upstairs |
 |
| Looking down on the opened garage door |