| Extension Phase 3 |
|---|
| Thumbnail View |
 |
| View from the dressing room to the ensuite |
 |
| To the master bedroom |
 |
| The new corridor wall towards the new bedrooms, with the ensuite to the left |
 |
| The single story roof |
 |
|
 |
|
 |
| Start of the new utility room wall |
 |
|
 |
|
 |
| The steel beam is being put in place |
 |
|
 |
|
 |
| Half of it at least |
 |
| Old cloakroom with the down pipe that is being diverted. |
 |
| A slight projection into the front room. |